Published July 7, 2000 | Version Published
Book Section - Chapter Open

Palomar adaptive optics project: status and performance

  • 1. ROR icon Jet Propulsion Lab
  • 2. ROR icon University of California, Berkeley
  • 3. ROR icon Cornell University

Contributors

Abstract

We describe the current performance of the Palomar 200 inch (5 m) adaptive optics system, which in December of 1998 achieved its first high order (241 actuators) lock on a natural guide star. In the K band (2.2 micrometer), the system has achieved Strehl ratios as high as 50% in the presence of 1.0 arcsecond seeing (0.5 micrometer). Predictions of the system's performance based on the analysis of real-time wavefront sensor telemetry data and an analysis based on a fitted Kolmogorov atmospheric model are shown to both agree with the observed science image performance. Performance predictions for various seeing conditions are presented and an analysis of the error budget is used to show which subsystems limit the performance of the AO system under various atmospheric conditions.

Additional Information

© 2000 Society of Photo-optical Instrumentation Engineers (SPIE). Observations at the Palomar Observatory were made as part of a continuing collaborative agreement between Palomar Observatory and the Jet Propulsion Laboratory.

Attached Files

Published - 31b.pdf

Files

31b.pdf

Files (501.3 kB)

Name Size
md5:76031d49cc3be46ceb6501d536ac4303
501.3 kB Preview Download

Additional details

Identifiers

Eprint ID
88209
Resolver ID
CaltechAUTHORS:20180724-151013257

Dates

Created
2018-07-24
Created from EPrint's datestamp field
Updated
2021-11-16
Created from EPrint's last_modified field

Caltech Custom Metadata

Series Name
Proceedings of SPIE
Series Volume or Issue Number
4007